Property, plant and equipment is the biggest number on most municipal balance sheets and the most common source of qualification. We prepare, review and physically verify GRAP compliant fixed asset registers, both movable and infrastructure, so the register agrees to the ledger and to what is actually there.

Request a proposal Chat on WhatsApp

Three things have to agree

An asset register passes audit when three things line up: what the general ledger says the municipality owns, what the register records, and what is physically standing there. Most municipal registers fail on at least one of them. Assets get disposed of but never removed. Infrastructure is built and capitalised as one line instead of being componentised. Useful lives are inherited from a consultant spreadsheet from years back and never looked at again. Work in progress sits in WIP long after the asset was commissioned.

None of that is a difficult technical problem. It is record keeping that has slipped, and it compounds every year. It can be fixed, but not in the weeks before a submission deadline.

What we deliver

Register preparation

A complete GRAP compliant fixed asset register built from your ledger, capital project records, tender documentation and physical verification, covering movable assets, immovable property and infrastructure.

Register review

Independent review of an existing register against GRAP 17, 16, 31 and 103, looking at completeness, measurement, componentisation, depreciation and whether it is ready to support disclosure.

Physical verification

Field verification of movable and infrastructure assets with barcode or QR scanning, GPS capture, photographs and condition assessment, using AssetVerify360.

Componentisation

Infrastructure split into significant components with their own useful lives, so depreciation and later replacements are recorded properly instead of against one undifferentiated asset.

Condition and useful life

Remaining useful life reassessed against observed condition and supported by evidence rather than a default policy life, then treated as a change in estimate where it moves.

Impairment assessment

Indicators evaluated under GRAP 21 for non-cash-generating assets and GRAP 26 for cash-generating assets, with the impairment calculated and documented where indicators are present.

Infrastructure is the hard part

Roads, water and sanitation networks, electricity reticulation, landfill sites and stormwater are usually where infrastructure registers break down. These assets last a long time, get partially replaced, are rarely measured at component level and often do not reconcile to the capital project ledger.

We work through infrastructure the way the standard expects it to be recorded. Identify the asset, break it into components with materially different useful lives, establish cost or deemed cost, assess condition on site, set remaining useful life from that condition, then reconcile the total back to the general ledger and to the capital expenditure for the year. Assets that were never recorded are brought on at deemed cost with the basis written up.

This feeds straight into mSCOA. The project and asset segments only report anything useful if the register carries the same asset identities the ledger does, which is why we treat mSCOA alignment as part of the asset work rather than a separate job.

How verification runs

StepWhat happens
1. BaselineCurrent register and ledger extracted, reconciled, and the differences quantified before anyone goes out to the field.
2. PlanningAssets grouped by location and custodian, verification teams and routes set, barcode ranges issued.
3. Field verificationEach asset scanned or captured, photographed, GPS stamped, condition rated and custodian confirmed on a mobile device. It works offline where there is no signal.
4. ExceptionsAssets found but not on the register, on the register but not found, moved, or in a different condition to the one recorded. Each one is investigated and resolved, not just listed.
5. Register updateVerified data written back to the register, additions and disposals processed, depreciation recalculated, and the register reconciled to the ledger.
6. ReportingVerification report, exception register, condition summary and the evidence pack supporting every movement.

Swipe sideways to see the rest of the table.

Why we built our own software for this

Verification done on paper and typed into spreadsheets tends to fail audit for one reason. There is nothing to show that the person who signed the sheet ever saw the asset. We built AssetVerify360 because our own verification work needed GPS coordinates, timestamped photographs, a record of who verified what and when, and offline capture for assets well outside network coverage. Municipalities now licence it directly.

Frequently asked questions

What makes a fixed asset register GRAP compliant?

It records every asset the municipality controls, in enough detail to measure it under the relevant Standard of GRAP. That means each asset identified and located, classified correctly, measured at cost or deemed cost, componentised where components have materially different useful lives, depreciated over an assessed remaining useful life, assessed for impairment, and reconciled to the general ledger.

How often should assets be physically verified?

Movable assets annually, which is also what most municipal asset management policies require. Infrastructure is normally done on a cycle, with condition assessment covering part of the network each year so the whole network gets reassessed over a set period instead of all at once.

Can you rebuild a register that was lost or never existed?

Yes. Reconstruction works from whatever evidence survives: the general ledger and capital expenditure history, tender and contract documents, project completion certificates, insurance schedules, deeds records for immovable property, and physical verification. Where cost cannot be established, deemed cost is used and the basis is documented for the auditor.

Do you handle immovable property and land?

Yes. That includes reconciling the register to deeds office records, picking up land that is unregistered or registered incorrectly, and classifying correctly between property, plant and equipment, investment property under GRAP 16 and heritage assets under GRAP 103.

Will this resolve a property, plant and equipment qualification?

It deals with the cause of most of them. PPE qualifications generally come down to completeness, existence, measurement or componentisation, and a properly rebuilt and verified register that reconciles to the ledger addresses all four. Whether the qualification actually lifts also depends on whether comparatives can be restated, which we assess at scoping.

Discuss your municipality’s requirements

Ambition Partners Advisory is a Chartered Accountant (SA) led practice working with municipalities, municipal entities, government departments and public entities across South Africa. Tell us where you are in the reporting cycle and we will send you a scope, timeline and fee.

Request a proposal Chat on WhatsApp